Time to get everything final fitted
and locked down. The seat is in
and done, Pedals are perfect.
Wiring is nearly finished. (Not in
this picture)
Shifter and
delaybox mount
are done. Our
tunnels are
designed to come
out without
moving the
shifter, makes it a
lot easier in
Thrash mode.
All the tinwork is
finished!! Tunnel
is finished and is
very tight fitting.
The window net,
roll bar padding,
seat belts, and
driver retainer
plate (The
arrowhead
shaped piece in
the door) are
installed.
Here's that bullet proof rear end hangin by the
double adjustable Varishock coilovers. The
wishbone is still layin on th floor. Below is the
tubliner, I run one piece of 3/16" plastice from
front to back to keep dings to a minimum. I
also cover the flats behind the seat, and the
extensions between the two. They will look
good for a long time.
NEXT